This might well be very obvious an deasy, but I cannot figure out how to verify two jobs in a row in SurfCam Verify V3. Say I want to run the roughing job, and remove a lot of material, then verify a finishing job. It looks like the fininshing job starts with the full stock, and that makes it difficult to see wether it moves correctly. Is there a way I can cintinue removing material based on the result of another job, in SurfCam verify,.
Cheers
Best regards
Jens Tandstad