Man look at all those new tool holders...clean as a whistle...still got all of the warning stickers...Nothing better than a new machine
I build a product that I cut in the 4th, its little over 40 inches long...starts out 82 lbs and almost 2 hours later is 45 lbs. All with a 3 inch face mill.
I have tried everything coolant wise...but the best compromise...so far is turning the coolant on and off at different stages of the program. Doesn't sound like much and its a lot of editing but it saves about 5-7 gal of coolant a day