This is the main step of a part we produce. Currently it takes 9+ minutes to run this code through the rough, finish, & flatlands operations. I don't have a lot of experience with machining using the 3-axis, usually for our needs 2-axis has always been sufficient.

I did try the advance rough with no time benefit. It just seems like doing this small of a part should be faster.

Would like if someone fluent with BC would mind taking a look and see if they see efficiency improvements I could make?

Just in case the EM's dont transfer with a bbcd file, I am using a 3F .5 carbide and a 3F .1875 carbide.

I am running V26
Part is being run on a HAAS Mini
6k spindle

Thanks