587,704 active members*
3,570 visitors online*
Register for free
Login
IndustryArena Forum > MetalWorking Machines > Bridgeport Machines > Bridgeport / Hardinge Mills > Series 1 Boss 3 Head Rebuild (2J Head) - Stuck Here.
Results 41 to 60 of 75

Threaded View

  1. #1
    Join Date
    Mar 2012
    Posts
    192

    Series 1 Boss 3 Head Rebuild (2J Head) - Stuck Here.

    Hi Folks,

    I'm about to order a top end rebuild kit. Do these kits cover the CNC version mill with the nod and tilt head? I noticed that my top end quill assembly is longer than the typical manual machine. I'm also curious if the kits usually come with the bearings below the bull gear, which is where I am now.

    I do not know which bolts [or nuts] to remove here? I've read a few counts that one set is NOT to be loosened as that is a factory alignment. Does anyone know which set to remove here, upper bolts or lower nuts?

    Thanks for any assistance.
    Attached Thumbnails Attached Thumbnails BP-head-IMAG0353.jpg  

Similar Threads

  1. Bridgeport 2J head rebuild
    By tjamscad in forum Bridgeport / Hardinge Mills
    Replies: 4
    Last Post: 07-25-2012, 03:16 PM
  2. Bridgeport head stuck.
    By dave86 in forum Bridgeport / Hardinge Mills
    Replies: 5
    Last Post: 07-11-2012, 02:23 PM
  3. X2 rebuild head issue
    By Marc N Fournier in forum Benchtop Machines
    Replies: 2
    Last Post: 12-06-2011, 08:26 AM
  4. Head Rebuild
    By MSGMachine in forum Bridgeport / Hardinge Mills
    Replies: 2
    Last Post: 03-07-2010, 09:03 PM
  5. 2J head rebuild, What did I miss??
    By Stillearnn in forum Bridgeport / Hardinge Mills
    Replies: 1
    Last Post: 10-25-2006, 08:21 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •