587,434 active members*
3,077 visitors online*
Register for free
Login
IndustryArena Forum > MetalWorking Machines > Bridgeport Machines > Bridgeport / Hardinge Mills > Bridgeport Eztrack Series II -Ferror Program
Results 1 to 3 of 3
  1. #1
    Join Date
    Apr 2005
    Posts
    4

    Bridgeport Eztrack Series II -Ferror Program

    Hello all
    Ref: Milling machine Bridgeport Eztrack series II CNC 3 axes.

    Recently I change the Servo Amplifier of X axes ( Advanced Motion Controls)
    To calibrate this axes ( after moving the 4 diferent resitor pot. in the amplifier card -loop gain-current limit.....) the manual of the Bridgeport, says that we need to run the FERROR program to do the calibration . This program is not in the Floppy that comes with the machine ( system operating backup files).
    ¿ Does any one have this program ? ¿ How to run it and calibrate the axes (speed).
    Appreciate some help.
    To send the program please use this Email: [email protected] or [email protected]
    Thank
    Yuso

  2. #2
    Join Date
    Nov 2004
    Posts
    3028
    Have you tried looking at other programs in the utilities section. I believe the following error set up program is a TXT file, not a conversational file. It is best to run it with PFM.exe. This is accessed with DOS. It can run a program with it in the tuner section and you can watch position error, DAC command, etc.

    George
    (Note: The opinions expressed in this post are my own and are not necessarily those of CNCzone and its management)

  3. #3
    Join Date
    Apr 2005
    Posts
    4
    Thank George
    I will try as your recomendation .

    Thank for the help
    Yuso

Similar Threads

  1. Bridgeport Series II Retrofit
    By Cold Fusion in forum Vertical Mill, Lathe Project Log
    Replies: 143
    Last Post: 07-01-2007, 02:37 AM
  2. Bridgeport Series 1 Retrofitted!
    By biomed_eng in forum CNC Machine Related Electronics
    Replies: 9
    Last Post: 08-25-2006, 02:19 AM
  3. Bridgeport Series 1 CNC w/ BOSS 5 serial cable needed
    By bbuonomo in forum DNC Problems and Solutions
    Replies: 16
    Last Post: 05-30-2005, 11:05 AM
  4. Bridgeport Series 1 Limit Switch
    By kewl_cat in forum Bridgeport / Hardinge Mills
    Replies: 68
    Last Post: 05-02-2005, 04:28 AM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •