Has anyone ever come across this weird time mis calculation...
In turning when I run a simulation with use cycle option for a turning operation, the time for the part says 2 min 30 second, but soon as I select semi / finish on with ISO turning rest material (bottom right of technology page) the simulation time jumps to 7 hours +.
I have checked the tool data, and have made the finish speeds and feeds the same as the roughing ones. SO what the hell could it be. The program from the G code seems right, but this timing thing is way out. Its not actually a problem at the end of the day, but just weird.