Is there a way to use one tool for Multiple Work Offsets so I can minimize tool changes? For example, I have a 3 op part, and each operation is in its own fixture/vise and they currently run off subprograms. I was wondering if I could rough Op2 right after Op1, and how can I go about it since op2 is not a duplicate of op1.

Thank you.