587,028 active members*
2,935 visitors online*
Register for free
Login
IndustryArena Forum > CAM Software > SprutCAM > Changing part machining order
Results 1 to 12 of 12

Hybrid View

  1. #1
    Join Date
    Nov 2007
    Posts
    2151

    Re: Changing part machining order

    Depends on a few things,
    I think this is what your wanting to do.
    If they are setup as 3 separate parts with 3 separate work pieces as shown below.
    Then under job assignment you assign operations to each part in the order you want them done "marked 1,2,3"
    Attachment 254438

    This also works if you are milling many different types of parts and sizes in the same setup. or parts that become fixtures later on in program in the same setup also.
    Job assignment order in this case has one level of control.

    md


    oops I re-read your text and it says bar of material, that's different

  2. #2
    Join Date
    Jun 2014
    Posts
    1780

    Re: Changing part machining order

    Quote Originally Posted by mountaindew View Post
    Depends on a few things,
    I think this is what your wanting to do.
    If they are setup as 3 separate parts with 3 separate work pieces as shown below.
    Then under job assignment you assign operations to each part in the order you want them done "marked 1,2,3"
    Attachment 254438

    This also works if you are milling many different types of parts and sizes in the same setup. or parts that become fixtures later on in program in the same setup also.
    Job assignment order in this case has one level of control.

    md


    oops I re-read your text and it says bar of material, that's different
    Select one set of curves per op is what I would do, then use three separate ops with a different curve for each, and put the ops in the order you want them done.
    I dont know of a way to select the curves in the order you want them done in the software for 2 d contouring.
    mike sr

  3. #3
    Join Date
    Jun 2014
    Posts
    1780

    Re: Changing part machining order

    Thanks for bringing this up as I have a finishing waterline op of 4 holes and it always wants to start on hole #3, this is OK but I would rather it start with one of the end holes, I think I will try the separate ops for this and see what happens! Thanks guys..
    mike sr

Similar Threads

  1. Adding tabs and changing the order of plunge etc
    By Raf-1200 in forum SolidCAM for SolidWorks and SolidCAM for Inventor
    Replies: 2
    Last Post: 01-04-2014, 03:49 PM
  2. Machining order
    By pp-TG in forum BobCad-Cam
    Replies: 25
    Last Post: 09-13-2013, 10:57 PM
  3. Changing the order of operations?
    By doublec4 in forum SolidCAM for SolidWorks and SolidCAM for Inventor
    Replies: 4
    Last Post: 01-15-2013, 05:10 AM
  4. V23 machining order change?
    By richcam1 in forum BobCad-Cam
    Replies: 2
    Last Post: 12-12-2009, 11:45 PM
  5. Changing order of the wizards table in Mach
    By Phishaholic in forum Tormach Personal CNC Mill
    Replies: 6
    Last Post: 08-23-2009, 05:04 PM

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •