586,882 active members*
3,611 visitors online*
Register for free
Login
IndustryArena Forum > Employment Opportunity / RFQ (Request for Quote). > RFQ (Request for Quote) > Need large and small parts and tooling in less than 2 weeks
Results 1 to 10 of 10
  1. #1
    Join Date
    Apr 2014
    Posts
    11

    Need large and small parts and tooling in less than 2 weeks

    Good morning
    we need parts quick !!!!!!!!
    from large;
    car headliners vacuum formed out of ABS? plastics other or tooling

    roof skin tooling, maybe 40lb tooling board?
    small parts;
    mechanism for our t tops latches pivots stand offs etc.
    mucket molds and/or rubber parts
    need quick turn around asap
    Thanks, Troy

    North Florida area USA

  2. #2
    Join Date
    Feb 2006
    Posts
    196

    Re: Need large and small parts and tooling in less than 2 weeks

    Troy,
    Two weeks is a pretty tall order but I would not want to dismiss it without first seeing the parts.
    We may be able to assist you with your large thermoformed tooling needs. Other things too but probably not in that time frame.
    Please send us your data and requirements and we'll see what we might be able to assist you with.
    Doug Pryor
    David Wolfe Design, Inc.
    Akron, OH
    www.davidwolfedesign.com
    [email protected]

  3. #3
    Join Date
    Aug 2010
    Posts
    57

    Re: Need large and small parts and tooling in less than 2 weeks

    I have some capability and an empty schedule for the small parts, depending on what they are.

    Feel free to email me at [email protected] or [email protected]

  4. #4
    Join Date
    Apr 2014
    Posts
    11

    Re: Need large and small parts and tooling in less than 2 weeks

    here is a rendering of the not quite final part and a PDF
    the tool will we about 59*54*9"'s
    we need the tool cut in half, the tool can be mdf tooling board etc. etc...
    to fit our 4X8 vacuum table
    Click image for larger version. 

Name:	headliner_V2_TF.jpg 
Views:	0 
Size:	30.8 KB 
ID:	250094
    Click image for larger version. 

Name:	headliner_V2_2D_TF.PDF 
Views:	0 
Size:	34.3 KB 
ID:	250096

  5. #5
    Join Date
    Apr 2014
    Posts
    11

    Re: Need large and small parts and tooling in less than 2 weeks

    we also need a tool made for molding composites parts over/in
    this will be a replacement roof skin
    please use tooling board 40 lbs or greater in density;
    that way we can pop out a few good first products?
    and a part for producing an in house mold?
    attached is a rendering of the proposed product and a PDF
    the final tool should be about 58"x 50"x 5"s
    we may make it female mould instead of a plug as to save some time
    all these parts are needed ASAP

    Attachment 250100
    Click image for larger version. 

Name:	roofskinv1pdf_TF.PDF 
Views:	0 
Size:	47.2 KB 
ID:	250102

  6. #6
    Join Date
    Apr 2014
    Posts
    11

    Re: Need large and small parts and tooling in less than 2 weeks

    also need poly-carbonate or acrylic tooling for forming these and/or the parts made for us!!!!!!!!
    Attachment 250106
    Click image for larger version. 

Name:	glass hatch v1.jpg 
Views:	0 
Size:	24.1 KB 
ID:	250108
    Click image for larger version. 

Name:	glass hatch v1 solid.PDF 
Views:	0 
Size:	73.9 KB 
ID:	250110

  7. #7
    Join Date
    Aug 2010
    Posts
    57

    Re: Need large and small parts and tooling in less than 2 weeks

    Any specs for the small parts/mechanism bits?

  8. #8
    Join Date
    Apr 2014
    Posts
    11

    Re: Need large and small parts and tooling in less than 2 weeks

    Quote Originally Posted by sabine View Post
    Any specs for the small parts/mechanism bits?
    will get small parts out after RFQ's have been relinquished to vendors

  9. #9
    Join Date
    Apr 2014
    Posts
    11

    Re: Need large and small parts and tooling in less than 2 weeks

    here's the drawings for the roof skin parts
    this is cut in half
    30" X 60" X 6" foam 40lb

    Attachment 250520

  10. #10
    Join Date
    Aug 2010
    Posts
    128

    Re: Need large and small parts and tooling in less than 2 weeks

    Quote Originally Posted by NobleTech View Post
    will get small parts out after RFQ's have been relinquished to vendors
    What does that mean?

Similar Threads

  1. Small Parts, Large Quantity
    By Falcon69 in forum North America RFQ's
    Replies: 16
    Last Post: 04-16-2018, 11:26 AM
  2. Which is best 1 large or 2 small rails
    By JohnZ in forum Linear and Rotary Motion
    Replies: 3
    Last Post: 03-23-2012, 07:34 AM
  3. whats better large or small
    By sparky970 in forum DIY CNC Router Table Machines
    Replies: 3
    Last Post: 08-07-2010, 12:03 AM
  4. Replies: 4
    Last Post: 12-15-2009, 12:13 AM
  5. Anodizing parts weeks or months after machining
    By jkujawa in forum Material Machining Solutions
    Replies: 1
    Last Post: 09-13-2008, 05:40 PM

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •