WE HAVE A ISSUE WITH TWIN TOOL TURRET, IT FUNCTION RIGHT ON MANUAL MODE BUT WHEN THE PROGRAM IS RUNING THE TOOL-CHANGE PROCEDURE DON`T EXECUTE
CAN YOU HELP ME...
THANKS.
WE HAVE A ISSUE WITH TWIN TOOL TURRET, IT FUNCTION RIGHT ON MANUAL MODE BUT WHEN THE PROGRAM IS RUNING THE TOOL-CHANGE PROCEDURE DON`T EXECUTE
CAN YOU HELP ME...
THANKS.
The Durga needs to have the turret in the index position of one turret in order to change the other turret under program control.
I think the index positions are position #1 for the front turret and position #21 for the back turret.
We have a Femco Durga 25 at school and leave tool positions #1 and #21 empty. We start a with #1 and #21 in position.
For example, if you have been using tool #4 and you want to use tool #25, you first have to change to tool #1 (put the front turret in the index position) and then change to tool #25.
If you want to change from tool #25 to tool #6, you first have to change to tool #21 (the back turret index position) and then change to tool #6.
Good Luck.