Re: When will "acorn" release?
Originally Posted by
LeeWay
Does it mention G54, G55, G56 etc...?
I'm definitely no expert but happened to be perusing the manual and ran across this:
"G54 - G59 - Select Work Coordinate System
G54 through G59 select among the six regular work coordinate systems (WCS #1 through WCS #6). After issuing
the code, subsequent absolute positions will be interpreted in the new coordinate system. Alternatively, the codes
E1 through E6 to can be used instead of G54 through G59.
Example:
G54 G0 X0 Y0 Z0 ; select first WCS, move to origin
G2 X1 I.5 Z-.5 ; mill something...
G0 Z.1 ; Rapid to position Z0.1
G55 X1 Y1 ; select second WCS, move to X1, Y1"
Milton in Tennessee ya'll!