Once I've created all my various operations and I have the list of those operations on the left side of my screen. After having gone through all the trouble of creating those operations, is there a way to change the sequence of those operations without having to re-do them?

In the same scenario, if I decide to add just one more operation to my list of operations and I want to place it at the top of the order, is there a way to do that without having to start from scratch?

I'm inclined to believe there is a way, I just don't know what it is or how to go about it.

Thanks in advance for any help you guys can offer up.

MetalShavings