Finally come down to the wire, I've got almost everything setup and just need to push the big red button, however I have a few questions.
I'm buying the Basic PCNC 1100 Package II
Since it's a little tight in my garage for this machine, I'm looking into renting a space. Now I'm not really a rich guy, especially after I buy this thing. So I'm looking into a few little spaces to start out with and eventually move into something a little larger. The place I'm looking at is a 10 x 20 storage unit that allows business to operate 24 hours for only $160 a month that also includes electric.
The problem I'm running into is, how much electric does this machine pull ?
The space only has one outlet, the outlet runs from a main line on the ceiling, which looks like it's only made for a light bulb, but has a light bulb socket convertor that gives two outlets.
Here's the outlet convertor that everyone there is using.
http://www.christmaslightsetc.com/im...ocket_2tap.jpg
What items do you think are needed with your first purchase ?
I was looking at things like
- Load Meter (31101)
- Machine Oil (31386)
- R8 Drawbar (30507) (just to have an extra one)
- Lifting Bar (30576) (is this really needed) ?
- TTS-R8 (30146)