Hello everybody
I am currently working ( part time) on a processing Centre with 21MB controller. As I am an old ‘Heidenhain guy’ I need your help. I have a problem with fraises. Who could write me a cycle by hand for a hole D45 and 25 deep. Either with pilot hole or without.
Or is there a cycle in the manual guide?
Many thanks in advance