The links appears "This page cannot be displayed". If you give me a sample of g-code machine reads, the drawing you wish as DXF or CAD model, the list of tools in use and the type of control I can...
Type: Posts; User: billcha
The links appears "This page cannot be displayed". If you give me a sample of g-code machine reads, the drawing you wish as DXF or CAD model, the list of tools in use and the type of control I can...
I can create for you g-code
Are you sure post processor output G2/G3 ? Witch post processor do you use? Try to NC data format tab set X,Y,Z,I,J,K
%
O4550
(DATE : WED OCT 15 13:47:21 2014)
(MACHINE : SNK_5AX)
N2 G21
N4 M31
N6 (===== TOOLS IN USE ============)
N8 (DESCR :T1 SHELL MILL D 125)
N10 (DESCR :T2 END MILL 60 R4)
N12...
what controller do you use?
You need customized Post Processor. By default is ZX plane as turn. Milling mode includes all other planes plus polar coordinates plus B , Y , C axis depends from the model plus many many other...
Usually the demo post processors delivered with the cam software are 3 axis. You need a custom post processor for your needs 5 axis simultaneous with A & B axis (A=around X and B=around Y) table and...
I think E can be used for threads/inch.
Try G33 X<x> Z<z> E<threads/inch>
for a simple thread cycle usually needs X end point Z end point and F federate rated to pitch.
G33 X<x> Z<z> F<f>
for compound thread cycle needs extra parameters like Q times R return point and K...
It would be nice to enclosure an eng.drawing to specify close tolerances or holes specifications (tapping , reaming). These operations can increase the cost.
I think you have num or acramatic or something like this control because I saw G70 (inch mode). You need a helix operation I think.
You start from X0.0 Y0.0 Z0.0 to z-0.850"
I don't know the final...
nutator angle is only for headaxis like this
Nutating CA/CB head Setup
At this machine nutator angle is 45 deg.The offsets of DZ and DX are needed.
At orthogonal spindles which centers of C axis...
I have a CATIA V5 file server services 6 users in a manufacturing dept.
I whould like to know which method to devide the users is ideal.
My first thought is to create 6 separate files (directories)...