I am looking to upgrade my Denford Mirac to have an ATC and am looking for a small 6 station tool changer, any condition as I am upgrading the control system at the same time. Thank you Liam
Type: Posts; User: DagnWal
I am looking to upgrade my Denford Mirac to have an ATC and am looking for a small 6 station tool changer, any condition as I am upgrading the control system at the same time. Thank you Liam
I am looking to upgrade my Denford Mirac to have an ATC and am looking for a small 6 station tool changer, any condition as I am upgrading the control system at the same time. Thank you Liam
Hi Jips It could be the air pressure, on my machine some times the air pressure switch takes some time to unload if the pressure drops, which makes the fault intermittent if you have bad air or are...
No I think that is number 3, mine and John’s arrived a few weeks ago, (I did post photo) and the total for the import charges was just under $2,000.00 (including the 10%GST)
I haven’t had time to...
Not sure yet, should have the bill in a day or so, but it looked like it was going to be around the $2,500 including the GST, about the same as a new tooth….
Yes, as they say, all good things come to those who are patient.
My SVM-2 arrived today, and it is very nice and well built.
Unfortunately it may be some weeks before I get to use it, but will post...
As one of the many quite customers waiting, thank you ihavenofish.
Why are they here speaking this sh%#??
Yes they do look that way, but in desperation I found a second hand machine to get my project started, it had done less the 10 hour work, too small but a start.
Unfortunately I had to replace the...
I also have spent some time looking for an R8 spindle in this configuration.
The Syil machines have a very similar system, but they too are hard to find at a reasonable price?
Hi Alan
do you still have this for sale?
thanks
Hi Ian
Yes I placed my order and deposit on the 15th of October 2013, for a SVM-2, with all the good bits ATC, Tool set, and a CNC Lathe that he was developing… so a large enough deposit to stress...
Yes I received an email Thursday.
He has been working very hard to catch up with the work load in front of him and investigating ways to improve production.
Due to this he has not been able to...
Defeng is on the mend
Hi all, yes Defeng has been ill, and yes he is get back onto the orders, I received an email today
Defeng is on the mend
Hi all, yes Defeng has been ill, and yes he is get back onto the orders, I received an email today
hmmmm...
I also ordered a machine in early October 2013 the SVM-2, with a lot of bits, and the silence is distressing, (22 days most unusual) if we know we can plan, we might get sad or cranky, but...