Sorry. I misread the original post. As far as I know, the part conveyor is built into the M code for the parts catcher. That is if the parts conveyor came from the factory with the machine. If it is...
Type: Posts; User: makinstuff59
Sorry. I misread the original post. As far as I know, the part conveyor is built into the M code for the parts catcher. That is if the parts conveyor came from the factory with the machine. If it is...
The feedrate of .01 IPM would take 10 minutes to complete the .100 of movement
G71/G72 Canned cycle
G71 U.1 R.03
G71 P10 Q20 U.01 W.005 F.01
N10 G0 X..... Z.....
G1 Z0
;
;
;
;
This is how I have done multiple pieces using a shift.
You set a variable for how many pieces you want.
Create a parts counter and then a looping statement.
Here is an example
#525=5(NUMBER...
it is M200 for that machine