Is the dwell long enough before you open the collet? On our L-20s and L-25s we use a one second dwell. Does the material run freely through the open collet by hand?
Type: Posts; User: kgswiss
Is the dwell long enough before you open the collet? On our L-20s and L-25s we use a one second dwell. Does the material run freely through the open collet by hand?
I have read many forums and PDFs on this subject but still cannot seem to have complete success. We are able to send and receive programs, but our problem is that the Mazak sends in EIA (G-code) and...