585,962 active members*
3,489 visitors online*
Register for free
Login
IndustryArena Forum > MetalWorking Machines > Cincinnati CNC > Pallet shuttle on 630 XT 2100 acramatic
Results 1 to 6 of 6
  1. #1
    Join Date
    Oct 2012
    Posts
    84

    Pallet shuttle on 630 XT 2100 acramatic

    Have a 5 axis 630 and I am trying to get the machine to run one side of a part on the rotary and then shuttle the pallet, flip part and run the other side either continuing to run current program or run another. The M60 standard code is not supported by the control. Has anyone done this? If so can you help me through this? Thanks

  2. #2
    Join Date
    Oct 2012
    Posts
    84

    Re: Pallet shuttle on 630 XT 2100 acramatic

    I am going to just try probing for location and doing a jump on whether it hits or not.

  3. #3
    Join Date
    Dec 2006
    Posts
    584

    Re: Pallet shuttle on 630 XT 2100 acramatic

    When you run the first set of parts, if you press the auto restart button before the cycle has ended, the pallet should change automatically and run the next set of parts. When you flip the parts you should press the auto load button prior to the end of cycle and it will repeat. Look in your operator book.


    Mike cncmachineservices (dot) com

  4. #4
    Join Date
    Oct 2012
    Posts
    84

    Re: Pallet shuttle on 630 XT 2100 acramatic

    This would be running a seperate program then? How is this set up?

  5. #5
    Join Date
    Dec 2006
    Posts
    584

    Re: Pallet shuttle on 630 XT 2100 acramatic

    You need to assign the part program with the pallet, not sure which screen that is but it should be under machine setup or program management.

    Mike cncmachineservices (dot) com

  6. #6
    Join Date
    Oct 2012
    Posts
    84

    Re: Pallet shuttle on 630 XT 2100 acramatic

    I will take a look at this when I am out at the machine asap. I have tried to assign the programs to the pallet like setups 1 and 2 but it just tried to run both programs in succession. What I ended up doing is checking a Z position to find whether it was first or second side and running the appropriate section of the program with a jump. I would like to do this with the setup so as to be able to run H1,2,3/ D1,2,3 etc on both sides rather than 8 offsets and 15 tool offsets. I suppose either way it is a bit of a handfull.

Similar Threads

  1. Yang/Yam hsmc-400 Pallet Shuttle
    By golfron in forum Community Club House
    Replies: 0
    Last Post: 01-21-2014, 03:56 AM
  2. NEED ACRAMATIC 2100
    By nikolamkd in forum Cincinnati CNC
    Replies: 0
    Last Post: 01-12-2012, 09:53 PM
  3. Need help acramatic 2100
    By logger in forum CNC Machining Centers
    Replies: 0
    Last Post: 03-19-2011, 11:41 PM
  4. Acramatic 2100
    By clayman in forum MetalWork Discussion
    Replies: 1
    Last Post: 02-19-2011, 12:29 AM
  5. Acramatic 2100 G83
    By cnccalgary in forum MetalWork Discussion
    Replies: 1
    Last Post: 03-11-2009, 04:03 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •